1) The roof is done.
2) Exterior siding repair and replacement is underway.
3) Electrical rough is nearing completion.
4) Exterior doors (the main ones anyway) are in.
5) Plumbing rough is complete.
6) Main windows are installed.
7) Framing is 98% complete.
8) Basement windows have concrete sills poured.
9) Huge tree out back about to removed.
10) Fifth dumpster getting emptied tomorrow.
You get the picture. In more than one way: